You don't have javascript enabled. Good luck with that.
Pencarian
Kolam Penahan Lumpur KBT Dikuras

East Flood Canal Sandtrap Dredged

Various ways to anticipate flood in capital keep being accelerated by Jakarta Water Management Department. One of them is by dredging the East Flood Canal (KBT) sandtrap in Cakung, East Jakarta.

We deepen it into four meters

A ​​300x500 meters pond in KBT is function to hold the mud flowing into the estuary. In the past year, almost all parts of the pool was filled with mud carried by the canal flow.

Head of Unit Equipment and Supplies (Alkal) for Jakarta Water Management Department, Aris Komaris Nandika stated that his side deployed five heavy equipments consist of two units long arm excavator, two amphibious excavator units and one dragger unit.

KBT will Be Transformed Into Culinary Tour Site

"The work has been carried out since two weeks ago," he said, Tuesday (8/18).

"We predict the work will be completed in October. We deepen it into four meters," he disclosed.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye741 personAldi Geri Lumban Tobing
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye640 personTiyo Surya Sakti
  3. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye417 personBudhi Firmansyah Surapati
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye395 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye367 personNurito