You don't have javascript enabled. Good luck with that.
Pencarian
Kolam Penahan Lumpur KBT Dikuras

East Flood Canal Sandtrap Dredged

Various ways to anticipate flood in capital keep being accelerated by Jakarta Water Management Department. One of them is by dredging the East Flood Canal (KBT) sandtrap in Cakung, East Jakarta.

We deepen it into four meters

A ​​300x500 meters pond in KBT is function to hold the mud flowing into the estuary. In the past year, almost all parts of the pool was filled with mud carried by the canal flow.

Head of Unit Equipment and Supplies (Alkal) for Jakarta Water Management Department, Aris Komaris Nandika stated that his side deployed five heavy equipments consist of two units long arm excavator, two amphibious excavator units and one dragger unit.

KBT will Be Transformed Into Culinary Tour Site

"The work has been carried out since two weeks ago," he said, Tuesday (8/18).

"We predict the work will be completed in October. We deepen it into four meters," he disclosed.

Linked News
Popular News indeks
  1. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye581 personAldi Geri Lumban Tobing
  2. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye547 personAldi Geri Lumban Tobing
  3. Transjakarta Modifies Mikrotrans Routes JAK 48A, JAK 50, and JAK 79

    access_time12-10-2026 remove_red_eye514 personAldi Geri Lumban Tobing
  4. Way to Go, Kid! Transjakarta Surprises Young Local Commuter in East Jakarta

    access_time11-10-2026 remove_red_eye445 personAldi Geri Lumban Tobing
  5. Jakarta Sends Transport Personnel to Street Level to Clear Morning Rush-Hour Jams

    access_time11-10-2026 remove_red_eye348 personAldi Geri Lumban Tobing